Bluetooth|Jun.
●?On June 11, the Bluetooth SIG Board of Directors approved the new?(QPRD) v3, which outlines the new Bluetooth Qualification Process
Intel EVO (Project Athena) IAT Test|Jun.
●?Intel EVO System Design Spec. 5th Edition rev.1.0 released in May 2024 for Lunar Lake and Arrow Lake Platforms.
Matter|Jun.
●??CSA Member Meeting – Washington, DC
-
Jun 24-27, 2024
-
Washington, DC
USB|Jun.
●?Allion Labs Taiwan is approved for USB 3.2 Gen 2×2 Host and Peripheral testing.
●?The products below must attend the PIL for certification, if it is the company’s first USB4 certification.
-
USB4 v1 Silicon Hosts and Hubs/Docks